黄河龙口水利枢纽工程


       黄河龙口水利枢纽是黄河万家寨水利枢纽的配套工程,位于黄河北干流托龙段尾部,坝址上游距万家寨水利枢25.6km。工程任务以发电为主,同时对万家寨水电站进行反调节。水库总库容1.96亿m³,最大坝高51m,电站总装机容量420MW,多年平均发电量13.02亿kW·h,工程的建设投运对促进当地经济社会的发展、改善生态环境将发挥重要作用。我们对有关砂石骨料、工程设计变更及优化、1~10#坝段及发电厂房基岩质量鉴定、调整概算报告审查、施工组织设计方案咨询、水库调度运用方案研讨等进行了技术研究并提出科学的解决方案。

      The Yellow River Longkou Hydro-junction is a supporting project of the Wanjiazhai Hydro-junction of the Yellow River. It is located at the tail of the Toro Section of the main stream of the Yellow River. The upper reaches of the dam are 25.6km away from the Wanjiazhai Water Control Project. Engineering tasks to power generation, at the same time anti-regulation of Wanjiazhai hydropower station. With a total reservoir capacity of 196 million m³, a maximum dam height of 51 m, a total installed capacity of 420 MW and a multi-year average generating capacity of 1.30 billion kW · h, the construction and operation of the project will play an important role in promoting local economic and social development and improving the ecological environment. We conducted a technical study on gravel aggregates, engineering design changes and optimization, rock quality appraisal of 1 ~ 10 # dam sections and power plant buildings, review of budget estimates, consultation on construction organization design proposals, and study on reservoir operation and utilization plans. Put forward a scientific solution.